In the last article, we introduced the common burying point and burying point by Tag of dynamic Tag management service. Next, we will introduce the way of jumping burying point combined with Huawei analysis and specific operation tutorial.

>> What is combined with Huawei analysis jump buried point?

This buried point mode applies to scenarios where Huawei analysis reports are reported. Huawei analysis creates buried point templates based on common industry scenarios, which is suitable for viewing analysis reports on Huawei Analysis.

1.1 Establishing visual connections

  1. Choose Analysis > Intelligent Data Access > Buried Point Development, and click Visualize buried points next to the buried point analysis report.

  2. In the dialog box, select the application that you want to bury and click Unbury. The DTM visual burying interface is displayed.

  3. On the “Select code Template” page on the left, the system automatically generates the code template. On the “Add Burying Point” page on the right, confirm the URL of the burying point and click “Start Burying Point”.

1.2 Adding buried points

1) The system jumps to the page of “Add buried point”, click the “Add buried point” button on the right.

2) Select the element you want to bury and circle the element on the left side of the page

3) After clicking the circled element, if the circled element is of the same kind, the system will pop up the following prompt box.

If you click “OK”, the element is buried as a similar element; If you click cancel, the element is buried as a non-homogeneous element.

4) On the Add Buried Point page, set a buried point name in the Buried Point Name drop-down list box.

Buried point Name is configured from the Huawei analysis report template and cannot be added or modified.

5) On the Parameter TAB page, set value for each key and click OK.

The key in parameters is configured from the Huawei analysis report template. The mandatory parameters cannot be deleted or modified.

6) (Optional) You can pause, edit, delete, and view details of an added buried point by clicking the button next to the buried point name as required.

1.3 Creating and Releasing versions

  1. The Version Management page is displayed. Click The New button.

  2. On the Create Version page, enter the version name and description.

  3. Select the Create and publish this version option.

  4. Click OK.

1.4 Triggering visual events

  1. Download the new version: Refresh the test site in your browser to download the latest DTM configuration

Note: By default, the DTM JSSDK downloads the latest version of the cache between 15 minutes, if you want to download the latest version immediately, you can disable the browser cache and refresh the test site.

  1. Click any “View Details” button in HUAWEI Mate series module.

  2. View data on huawei analysis platform.

To learn more about dynamic tag management services please click >>

For more details on HMS Core, please see:

>> Huawei Developer Alliance official website

To participate in the developer discussion go to CSDN or Reddit >> download demo and sample code on Github or Gitee >> Resolve integration issues go to Stack Overflow

The original link: developer.huawei.com/consumer/cn…

Original author: Pepper